Brownsville Public Utilities Board: backflow testing rules
Serves Brownsville, TX. 7 points from Brownsville Public Utilities Board's own pages, read October 6, 2026, each linked to the page it came from.
Brownsville Public Utilities Board at a glance
- When the test is due
- BPUB's Cross-Connection and Backflow Prevention Program requires backflow prevention assemblies to be tested every year. Source.
- How the report is filed
- The tester completes a BPUB Test and Maintenance Report for each assembly on the premises, using BPUB's domestic/irrigation or fireline forms. Source.
- If a test is missed
- After installation, the installer must call BPUB for inspection or risk termination of service. Source.
- Approved testers
- 38 companies on Brownsville Public Utilities Board's own list, read October 6, 2026, each with a "Utility-Approved Tester" badge on its card here. The list.
Who must test
- Backflow prevention assemblies must be tested when installed and every year after, following BPUB performance standards and field test procedures. Source.
Notices and deadlines
- BPUB sends notification letters for annual testing of external and internal backflow assemblies at commercial and residential sites. Source.
Tester registration
- Irrigation assemblies are tested by a licensed backflow prevention assembly tester; assemblies on fire line services must be tested by a licensed fireline tester. Source.
Approved testers
- BPUB links a Cross Connection Control and Backflow Prevention List of Testers (PDF). Source.
From notice to filed report, the steps are the same everywhere: how a backflow test goes.
Other water utilities in Texas
- Houston Public Works
- San Antonio Water System
- Dallas Water Utilities
- Austin Water
- Fort Worth Water
- El Paso Water
- Arlington Water Utilities
- Corpus Christi Water
Read October 6, 2026. Program page: bpub.com.