BackflowNear Test-Due Reminder

EPCOR Water Arizona: backflow testing rules

Serves . 6 points from EPCOR Water Arizona's own pages, read October 7, 2026, each linked to the page it came from.

EPCOR Water Arizona at a glance

When the test is due
A certified tester must test each backflow prevention assembly on installation, after cleaning, repair or overhaul, when relocated, annually, and when the regulator requires it. Installation, maintenance and testing are the customer's responsibility. Source.
How the report is filed
Test reports go to the Cross Connection Control Department within 30 days of the test, on EPCOR's Backflow Prevention Assembly Test Report Form. Source.
Approved testers
90 companies on EPCOR Water Arizona's own list, read October 6, 2026, each with a "Utility-Approved Tester" badge on its card here. The list.

Who must test

  • Backflow prevention assemblies must be within 36 inches of the water meter unless the department directs otherwise, and the assembly type must match the hazard on the premises. Source.

Notices and deadlines

  • The department notifies affected customers of their annual testing requirements. Source.

Tester registration

  • A customer who uses a tester not on EPCOR's list must provide proof of the tester's certification and test equipment calibration. Source.

Approved testers

  • EPCOR publishes a Certified Backflow Prevention Assembly Tester List. Listed companies have shown certification, gauge calibration, at least $1 million liability insurance and a state contractor's licence. Source.

Program

  • EPCOR's Cross Connection Control Department helps commercial and multi-residential property owners meet backflow rules, inspects buildings and keeps a database of assemblies and their test history. Source.

From notice to filed report, the steps are the same everywhere: how a backflow test goes.

Other water utilities in Arizona

Read October 7, 2026. Program page: epcor.com.

Find a tester Set reminder