City of Asheville Water Resources: backflow testing rules
Serves Asheville, NC; Black Mountain, NC; Weaverville, NC; Woodfin, NC. 7 points from City of Asheville Water Resources's own pages, read October 7, 2026, each linked to the page it came from.
City of Asheville Water Resources at a glance
- When the test is due
- Asheville sends backflow test request notices, which come from Aquaresource.app, tecnxs.com or an ashevillenc.gov address. Tests may be filed up to 60 days before the due date. Source.
- How the report is filed
- AquaResource is the only official way to submit test results in Asheville, and reports are due within 10 business days of the test. Source.
- Fee
- Asheville does not currently charge for submitting a failed test. Source.
- If a test is missed
- A water account whose test is not filed by the due date may face fines and temporary service interruption. Failed assemblies must be repaired within 10 business days. Source.
- Approved testers
- No tester list on the City of Asheville Water Resources pages read here. Ask a North Carolina certified tester whether City of Asheville Water Resources has them on file.
Who must test
- Any water account connected to a well or water storage tank must install a reduced pressure backflow assembly or disconnect from the city water line. Source.
Tester registration
- Testers must register on the Aquaresource portal with a copy of an accredited NC or UF TREEO tester certificate and a calibration report for each test kit, and city staff approve access. Source.
If a test is missed
- A tester who files a test more than 10 days late gets a final warning on the first offense and a 3 month suspension on the second. Source.
Program
- The Asheville backflow department runs the Cross-Connection Control Program, tracking every assembly and making sure each is tested annually by NC certified testers. Source.
From notice to filed report, the steps are the same everywhere: how a backflow test goes.
Other water utilities in North Carolina
- Charlotte Water
- Raleigh Water
- Cape Fear Public Utility Authority
- City of Concord Water Resources
- City of Gastonia
- City of High Point
- Fayetteville Public Works Commission
- Greenville Utilities Commission
Read October 7, 2026. Program page: ashevillenc.gov.