BackflowNear Test-Due Reminder

Raleigh Water (City of Raleigh): backflow testing rules

Serves Raleigh, NC and merged systems in Wake County. Every point below comes from Raleigh Water (City of Raleigh)'s own pages, linked; check your notice for your own deadline.

Who must test

  • Every connection to Raleigh Water must have containment backflow protection; commercial customers need protection by degree of hazard for domestic, irrigation and fire services, with no grandfather clause. Source.
  • Newly installed assemblies must be tested by a Raleigh Water Certified Tester and the passing test submitted online. Source.

Notices and deadlines

  • Residential irrigation assemblies need a passing test submitted by July 1 every 3 years; commercial irrigation is tested annually by July 1; all other assemblies are tested annually on a schedule set by the property's ZIP code. Source.
  • Commercial irrigation assemblies are tested annually by July 1; other assemblies follow an annual ZIP code testing schedule. Source.

How the report is filed

  • Compliance is met when a City of Raleigh Certified Tester's passing test report is submitted online to Raleigh Water's vendor VEPO. Source.

Tester registration

  • Testers must keep a certification from a locally approved certification school, have annual calibration of a differential or electronic test kit, and meet other requirements of the Director; testers who lapse are removed from the list. Source.

Approved testers

  • Raleigh Water maintains a list of testers approved to work within its system. The list URL was not captured: raleighnc.gov program pages returned HTTP 403 to our fetcher. Source.

If a test is missed

  • Customers have 45 days to repair or replace a failing backflow assembly, then submit a passing test to VEPO. Source.

Read October 6, 2026. Program page: raleighnc.gov.

Find a tester Set reminder