BackflowNear Test-Due Reminder

Greenville Water: backflow testing rules

Serves Greenville, SC. Every point below comes from Greenville Water's own pages, linked; check your notice for your own deadline.

Who must test

  • Most commercial, industrial, irrigation (as noted) and private fire protection customers are required to install, maintain and test a backflow prevention assembly. Source.
  • All existing backflow prevention assemblies must be tested at least once annually. Source.

Notices and deadlines

  • Greenville Water mails the initial test notice 45 days before the device test due date, and allows a 15-day grace period after the due date. Source.

How the report is filed

  • All certified backflow testers must upload test results through Greenville Water's Backflow Test Result Portal (backflow.greenvillewater.com). Source.
  • For new assemblies the test report must reach Greenville Water within 10 days of starting water service. Source.
  • If an assembly fails and cannot be repaired immediately, the tester must return the failed test report to Greenville Water the same day. Source.

Tester registration

  • Testers new to Greenville Water must email a picture of their certification to bfp@greenvillewater.com; portal registration requires a valid SCDHEC certificate. Source.
  • Testers register on the Greenville Water backflow portal, and registration requires a valid SCDHEC certificate. Source.

If a test is missed

  • A test 15 days late draws a $500 non-compliance fee, and Greenville Water hires a third party to test the device. Source.
  • For a non-compliant device Greenville Water hires a third-party vendor to complete the test and bills repair costs to the account. Source.
  • Customers who do not return completed test reports within the 60-day period are in noncompliance and face administrative action up to discontinuance of service. Source.

Program

  • Greenville Water has a service-wide backflow prevention program administered by its Cross Connection Control Program, under its Cross Connection Control Manual. Source.

How to file your backflow test with Greenville Water

  1. Read your notice. Greenville Water mails the initial test notice 45 days before the device test due date, and allows a 15-day grace period after the due date.Source.
  2. Book a tester Greenville Water accepts. See finding a tester below; book early so there is time to repair a failed assembly.
  3. The tester tests the assembly and fills in the test report. A failed assembly is repaired and tested again.
  4. The report is filed. All certified backflow testers must upload test results through Greenville Water's Backflow Test Result Portal (backflow.greenvillewater.com).Source.
  5. Keep a copy and set a reminder for next year. Set a free test-due reminder.

Finding a tester Greenville Water accepts

We found no tester list on Greenville Water's own pages. Use a state certified tester, and check your notice in case it names the testers or the portal it accepts.

Before you book, ask the tester:

  • Are you registered with Greenville Water?
  • Will you send the test report to the utility for me, and how?
  • When is my report due? The date is on your notice; the tester needs time to test, repair if needed and file.

Other water utilities in South Carolina

Read October 6, 2026. Program page: greenvillewater.com.

Find a tester Set reminder